Case study · Livspace · Interior design SaaS · 2020

Livspace Canvas

One workspace for 2,000 interior designers, from lead to handover.

LivspaceProduct design leadWeb appSaaS

Design in motion

Walk through it.

A heuristic evaluation of the old Canvas.

Before / after

From branches to one board.

Every branch, by hand
BEFOREEvery branch, by hand
One timeline per project
AFTEROne timeline per project

Three solutions

Where the design does the work.

Project board
01 · PROJECTSEvery project, one board.Status, next steps and filters for managers.
Product catalogue
02 · CATALOGUEPitch from the catalogue.Products ready to drop into a design.
Kitchen designs
03 · DESIGNSDesigns worth sharing.Kitchen layouts, shared for feedback.

The screens

The workspace.

Pick a screen.

Project board
01 / 04Project boardEvery project and its status.

Under the hood

Evidence before pixels.

What Canvas does
01What Canvas does
Task flows
02Task flows

Want this for your product?